Summary:

100 Residential Condominium Units


Application Type: Discretionary Permit
Status: Approved
Supervisorial District: 1

Application #: 241488
APN: 029-021-47
Location: 5940 Soquel Avenue
Applicant:  Soquel Ave Group LLC
Project Planner: Jonathan DiSalvo 

Building Permit Application Status
To determine if a Building Permit Application has been submitted or, if one has been submitted, to find its status, please use the Application Status webpage.

Public Meetings
Planning Commission Meeting: December 10, 2025
Board of Supervisor Meetings: February 24, 2026

Background
The subject parcel, APN 029-021-47, is one of several sites that were rezoned by the County in 2008 to the Regional Housing Need (“R”) Combining District (“R-Combining District”), which allowed development of multifamily housing at a density of 20 units per acre. Concurrently with the rezoning of those sites, including the subject property to RM-2-R, the Board adopted a Planned Unit Development (PUD) ordinance prepared by County staff for each site to allow by-right development of housing at a density of 20 units per acre, as was required at the time to obtain State certification of the County’s 2009 Housing Element Update.

For the subject property, the specifics of the R-Combining District program implementation described above were as follows:

  • The County processed a PUD and associated Initial Study to identify the required conditions of approval for the construction of a by-right housing development of 100 residential units on APN 029-021-47.
  • On December 9th, 2008, the Board of Supervisors approved Permit No. 07-0414, which included a PUD (Ordinance No. 5027), together with a General Plan Amendment (from “Service Commercial/Light Industry” (C-S) to “Residential Urban High” (R-UH), and Ordinance No. 5026 to rezone the property from “Light Industrial (M-1) to “Multifamily Residential – 2,000 square foot minimum parcel size, Regional Housing Need Combining District” (RM-2-R), and approval of a Riparian Exception; and
  • Certified the Mitigated Negative Declaration under CEQA.

A PUD essentially functions as a site-specific zoning ordinance, incorporating all the standards for the site design, building placement, massing, etc., on a parcel, and provides a basis for recording the environmental mitigation measures that accompanied the rezoning to the R Combining District. The PUD modified the site development standards in effect in 2008 to reduce the amount of required parking and allow taller structures, among other modifications, in order to accommodate the development of housing at density of 20 units per acre on the subject site, resulting in a PUD for 100 dwelling units (the site is about five acres in area).

In order to allow the development of the site to be by-right (meaning the density cannot be reduced and no additional CEQA review can be required for the use), CEQA analysis was done at the time of the rezoning and PUD adoption. As the PUD defines both the framework of development standards and CEQA mitigation measures, development of the site must be generally consistent with the PUD development standards, though it is subject to Design Review by the Planning Commission and Board of Supervisors.

On January 14, 2025, Soquel Ave Group LLC and KB Home South Bay LLC filed Application No. 241488 with the County of Santa Cruz for Design Review of a 100-unit project at the subject site, including Amendments to the approved PUD. There are several main reasons driving the need for these amendments which have significantly evolved since 2008, such as: the original PUD was not reviewed by any developer’s civil engineering or design team to assess the feasibility of the proposed infrastructure connections to support the site; the need to bring the current conditions of approval into better alignment with current County Codes and best practices for infill development, current state law, and, the current cost environment for multifamily housing development.